{"data":{"id":"us-wa/rcw-84.34.121","jurisdiction":"us-wa","citation":"RCW 84.34.121","heading":"Information required.","body":"The assessor may require owners of land classified under this chapter to submit pertinent data regarding the use of the land, productivity of typical crops, and such similar information pertinent to continued classification and appraisal of the land.","path":["Title 84","Chapter 84.34"],"source_url":"https://app.leg.wa.gov/rcw/default.aspx?cite=84.34.121","current_through":"July 15, 2026","vintage":"","retrieved_at":"2026-09-06T04:33:12Z","sha256":"024a82f8c1f2564f0575390921216dcc2fe2e5f99c6167f943b6bd6c3e9f933e","source_id":"us-wa","stale":false,"prev":"us-wa/rcw-84.34.111","next":"us-wa/rcw-84.34.131"},"notice":"GroundRules: Original legal text. Not legal advice."}
