{"data":{"id":"us-wi/wis.-stat.-16.92","jurisdiction":"us-wi","citation":"Wis. Stat. § 16.92","heading":"Purchase of fuel, electricity, heat and chilled water.","body":"(1) In this section, “agency” has the meaning given in s. 16.52 (7).\n(2) Each agency shall utilize the most cost-effective means of procurement of fuel, electricity, heat and chilled water.","path":["Chs. 13-20, General Organization of the State, Except the Judiciary","Chapter 16 Department Of Administration","SUBCHAPTER V ENGINEERING"],"source_url":"https://docs.legis.wisconsin.gov/document/statutes/16.92","current_through":"2023-24 Wisconsin Statutes updated through 2025 Wis. Act 247 (published 9-4-26)","vintage":"","retrieved_at":"2026-09-05T12:00:08Z","sha256":"15e3b78ee3b35c7528614d31f06d9e972a3a515fb0fa387ac974398caa9e5454","source_id":"us-wi","stale":false,"prev":"us-wi/wis.-stat.-16.91","next":"us-wi/wis.-stat.-16.93"},"notice":"GroundRules: Original legal text. Not legal advice."}
