{"data":{"id":"us-wi/wis.-stat.-182.43","jurisdiction":"us-wi","citation":"Wis. Stat. § 182.43","heading":"Underpass authorized.","body":"Wherever a turnpike project divides the land of one owner so as to prevent ingress to and egress from said lands, the corporation is authorized to provide an underpass or culvert sufficient to provide ingress and egress between said lands. Plans for the existence of an underpass shall be admissible in evidence in condemnation proceedings.","path":["Chs. 178-226, Partnerships and Corporations; Transportation; Utilities; Banks; Savings Associations","Chapter 182 Miscellaneous Corporate Provisions; Turnpike Corporations"],"source_url":"https://docs.legis.wisconsin.gov/document/statutes/182.43","current_through":"2023-24 Wisconsin Statutes updated through 2025 Wis. Act 247 (published 9-4-26)","vintage":"","retrieved_at":"2026-09-05T12:01:03Z","sha256":"fe70fc564ea65f2aed0df67726d8783ae63ee52e8ca3a7acba469ee9b6c0f8a3","source_id":"us-wi","stale":false,"prev":"us-wi/wis.-stat.-182.42","next":"us-wi/wis.-stat.-182.44"},"notice":"GroundRules: Original legal text. Not legal advice."}
