{"data":{"id":"us-wv/w.-va.-code-21-11a-17","jurisdiction":"us-wv","citation":"W. Va. Code § 21-11A-17","heading":"Additional construction defects; additional notice of claim.","body":"A construction defect which is discovered after a claimant has provided a contractor with the original notice of claim is subject to the notice requirements and timetable of this article.","path":["CHAPTER 21. LABOR","ARTICLE 11A. NOTICE AND OPPORTUNITY TO CURE CONSTRUCTION DEFECTS."],"source_url":"https://code.wvlegislature.gov/21-11A-17/","current_through":"as of 2026-08-03; contains at least the enactments of the 2026 Regular Session","vintage":"","retrieved_at":"2026-09-06T00:25:47Z","sha256":"82581f5243e755ffea6d37a503dbf6f3eee2a8caf47b37a19cb187e434649a97","source_id":"us-wv","stale":true,"prev":"us-wv/w.-va.-code-21-11a-16","next":"us-wv/w.-va.-code-21-12-1"},"notice":"GroundRules: Original legal text. Not legal advice."}
