{"data":{"id":"us-wv/w.-va.-code-21-11a-9","jurisdiction":"us-wv","citation":"W. Va. Code § 21-11A-9","heading":"Service on additional parties.","body":"Within fourteen days after the initial service of the notice of claim required in subsection (a) of this section, the contractor shall forward a copy of the notice to each subcontractor, supplier and design professional who the contractor reasonably believes is responsible for a defect specified in the notice and include with the notice a description of the specific defect for which the contractor believes the subcontractor, supplier or design professional is responsible.","path":["CHAPTER 21. LABOR","ARTICLE 11A. NOTICE AND OPPORTUNITY TO CURE CONSTRUCTION DEFECTS."],"source_url":"https://code.wvlegislature.gov/21-11A-9/","current_through":"as of 2026-08-03; contains at least the enactments of the 2026 Regular Session","vintage":"","retrieved_at":"2026-09-06T00:25:47Z","sha256":"97d4f2e4b8054ef8bcff28fff922fe1b2aff6d00c96b882cd97404a30477ac04","source_id":"us-wv","stale":true,"prev":"us-wv/w.-va.-code-21-11a-8","next":"us-wv/w.-va.-code-21-11a-10"},"notice":"GroundRules: Original legal text. Not legal advice."}
