{"data":{"id":"us-wv/w.-va.-code-7-27-6","jurisdiction":"us-wv","citation":"W. Va. Code § 7-27-6","heading":"Finalization of road construction project plan.","body":"(a) Resolution of county commission. – After the public hearing or hearings are concluded and the public comment period is closed, and after receipt of any required resolution of the governing body of a municipality, as required in subsection (b) of this section, the county commission may, by resolution, finalize its road construction project plan: Provided, That if there is more than one road construction project in the road construction project plan, the road construction project plan shall include a prioritization of each road construction project.\n(b) Consent of municipality in which project located. – No county commission may adopt a resolution approving a road construction project plan, any portion of which is located within the boundaries of a Class I, II, III or IV municipality, without the adoption of a resolution by the governing body of that municipality consenting to the road construction project.","path":["CHAPTER 7. COUNTY COMMISSIONS AND OFFICERS.","ARTICLE 27. LETTING OUR COUNTIES ACT LOCALLY ACT","PART II. COUNTY ROAD AND BRIDGE CONSTRUCTION PROJECTS."],"source_url":"https://code.wvlegislature.gov/7-27-6/","current_through":"as of 2026-10-13; contains at least the enactments of the 2026 Regular Session (newest effective date 2027-07-01)","vintage":"","retrieved_at":"2026-10-18T02:42:25Z","sha256":"7b1fe0b4f2a1f873a34e181991525ae9654309d114ef1585162e4c7f692b6c73","source_id":"us-wv","stale":false,"prev":"us-wv/w.-va.-code-7-27-5","next":"us-wv/w.-va.-code-7-27-7"},"notice":"GroundRules: Original legal text. Not legal advice."}
