{"data":{"id":"us-wy/wyo.-stat.-16-6-402","jurisdiction":"us-wy","citation":"Wyo. Stat. § 16-6-402","heading":"Computation of life-cycle costs.","body":"(a) Life-cycle costs shall be the sum of:\n(i) Initial cost;\n(ii) The reasonably expected fuel costs over the life of the building based on the energy consumption analysis; and\n(iii) The reasonable costs of maintenance and operation as they pertain to energy systems.\n(b) Life-cycle costs shall be computed for two (2) or more alternatives for construction of the facility.","path":["TITLE 16 - CITY, COUNTY, STATE AND LOCAL POWERS","CHAPTER 6 - PUBLIC PROPERTY","ARTICLE 4 - PUBLIC FACILITY LIFE-CYCLE COST ANALYSES"],"source_url":"https://wyoleg.gov/statutes/compress/title16.pdf","current_through":"2026 Budget Session; as of 2026-07-01","vintage":"","retrieved_at":"2026-09-04T00:16:32Z","sha256":"12fffe95fe2fee6e76c3b36f14ae82666972ba39f04a7f7f450c334ab1210d4f","source_id":"us-wy","stale":false,"prev":"us-wy/wyo.-stat.-16-6-401","next":"us-wy/wyo.-stat.-16-6-403"},"notice":"GroundRules: Original legal text. Not legal advice."}
