{"data":{"id":"us-wy/wyo.-stat.-41-9-210","jurisdiction":"us-wy","citation":"Wyo. Stat. § 41-9-210","heading":"Levels, surveys and maps to be made; report to court required.","body":"As soon as may be after the confirmation of the said preliminary report, or within such time as the court may direct, said commissioners shall proceed to have all necessary levels taken and surveys made, and shall lay out said proposed work, make a map thereof and plans, profiles and other specifications thereof, and report in writing to the court.","path":["TITLE 41 - WATER","CHAPTER 9 - DRAINAGE DISTRICTS","ARTICLE 2 - OPERATION AND ADMINISTRATION"],"source_url":"https://wyoleg.gov/statutes/compress/title41.pdf","current_through":"2026 Budget Session; as of 2026-07-01","vintage":"","retrieved_at":"2026-09-04T00:16:32Z","sha256":"04554cfcf0f64bd34fcedb24a8ef127d7e0a9726474cf2b18eedd250b80e3f8d","source_id":"us-wy","stale":false,"prev":"us-wy/wyo.-stat.-41-9-206","next":"us-wy/wyo.-stat.-41-9-211"},"notice":"GroundRules: Original legal text. Not legal advice."}
