{"data":{"id":"us-wy/wyo.-stat.-41-9-211","jurisdiction":"us-wy","citation":"Wyo. Stat. § 41-9-211","heading":"Contents; starting points, routes and termini.","body":"The commissioners shall report whether the starting point, routes and termini of the proposed work and the proposed location thereof, as in the petition contained, are in all respects proper and feasible, and, if not, shall report such as are most proper and feasible.","path":["TITLE 41 - WATER","CHAPTER 9 - DRAINAGE DISTRICTS","ARTICLE 2 - OPERATION AND ADMINISTRATION"],"source_url":"https://wyoleg.gov/statutes/compress/title41.pdf","current_through":"2026 Budget Session; as of 2026-07-01","vintage":"","retrieved_at":"2026-09-04T00:16:32Z","sha256":"284ac82e65644e0e87cf7143081c432a88c0c73ae7cfaaabbe021d767d03eef9","source_id":"us-wy","stale":false,"prev":"us-wy/wyo.-stat.-41-9-210","next":"us-wy/wyo.-stat.-41-9-212"},"notice":"GroundRules: Original legal text. Not legal advice."}
