{"data":{"id":"us/10-cfr-1015.107","jurisdiction":"us","citation":"10 CFR 1015.107","heading":"Required administrative proceedings.","body":"DOE is not required to omit, foreclose, or duplicate administrative proceedings required by contract or other laws or regulations.","path":["Title 10—Energy","CHAPTER X—DEPARTMENT OF ENERGY (GENERAL PROVISIONS)","PART 1015—COLLECTION OF CLAIMS OWED THE UNITED STATES","Subpart A—General"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-10.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:09Z","sha256":"35f825002eb6f2496692ba1955f7b811a3556e796e792ce4b999612b4afc1cac","source_id":"us-cfr","stale":true,"prev":"us/10-cfr-1015.106","next":"us/10-cfr-1015.108"},"notice":"GroundRules: Original legal text. Not legal advice."}
