{"data":{"id":"us/10-cfr-2.700","jurisdiction":"us","citation":"10 CFR 2.700","heading":"Scope of subpart G.","body":"The provisions of this subpart apply to and supplement the provisions set forth in subpart C of this part with respect to enforcement proceedings initiated under subpart B of this part unless otherwise agreed to by the parties, proceedings conducted with respect to the initial licensing of a uranium enrichment facility, proceedings for the grant, renewal, licensee-initiated amendment, or termination of licenses or permits for nuclear power reactors, where the presiding officer by order finds that resolution of the contention necessitates resolution of: issues of material fact relating to the occurrence of a past event, where the credibility of an eyewitness may reasonably be expected to be at issue, and/or issues of motive or intent of the party or eyewitness material to the resolution of the contested matter, proceedings for initial applications for construction authorization for high-level radioactive waste repository noticed under §§ 2.101(f)(8) or 2.105(a)(5), proceedings for initial applications for a license to receive and possess high-level radioactive waste at a geologic repository operations area, and any other proceeding as ordered by the Commission. If there is any conflict between the provisions of this subpart and those set forth in subpart C of this part, the provisions of this subpart control.","path":["Title 10—Energy","CHAPTER I—NUCLEAR REGULATORY COMMISSION","PART 2—AGENCY RULES OF PRACTICE AND PROCEDURE","Subpart G—Rules for Formal Adjudications"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-10.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:09Z","sha256":"884d0048d5f2f725797f85f483663da247e34d3e03a5d747972183dc82117e9f","source_id":"us-cfr","stale":true,"prev":"us/10-cfr-2.649","next":"us/10-cfr-2.701"},"notice":"GroundRules: Original legal text. Not legal advice."}
