{"data":{"id":"us/10-cfr-205.353","jurisdiction":"us","citation":"10 CFR 205.353","heading":"Special investigation and reports.","body":"If directed by the Director, Office of Energy Emergency Operations in writing and noticed in the Federal Register, a utility or other subject entity experiencing a condition described in § 205.351 above shall submit a full report of the technical circumstances surrounding a specific power system disturbance, including the restoration procedures utilized. The report shall be filed at such times as may be directed by the Director, Office of Energy Emergency Operations.","path":["Title 10—Energy","CHAPTER II—DEPARTMENT OF ENERGY","SUBCHAPTER A—OIL","PART 205—ADMINISTRATIVE PROCEDURES AND SANCTIONS"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-10.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:09Z","sha256":"9c0544dbe560896710be8330f5f62223898fe858de919df6899d0e43c8199ae6","source_id":"us-cfr","stale":true,"prev":"us/10-cfr-205.352","next":"us/10-cfr-205.370"},"notice":"GroundRules: Original legal text. Not legal advice."}
