{"data":{"id":"us/10-cfr-501.60","jurisdiction":"us","citation":"10 CFR 501.60","heading":"Purpose and scope.","body":"(a) (1) If the owner or operator plans to construct a new baseload powerplant and the unit will not be in compliance with the prohibition contained in section 201(a) of FUA, this subpart establishes the procedures for filing a petition requesting a temporary or permanent exemption under, respectively, sections 211 and 212 of FUA.\n(2) Self-certification alternative. If the owner or operator plans to construct a new baseload powerplant not in compliance with the prohibitions contained in section 201(a) of FUA, this subpart establishes the procedures for the filing of a self-certification under section 201(d) of FUA.\n(3) If the petitioner owns, operates or controls a new powerplant, this subpart provides the procedures for filing a petition requesting extension of a temporary exemption granted under sections 211 or 311 of FUA.\n(4) If the petitioner owns, operates or controls a new or existing powerplant or MFBI, this subpart provides the procedures for filing a petition requesting extension of a temporary exemption granted under section 211 or section 311 of FUA.\n(b) If the petition is for an extension of a temporary exemption, the petitioner must apply for this extension at least (90) days prior to the expiration of the temporary exemption.","path":["Title 10—Energy","CHAPTER II—DEPARTMENT OF ENERGY","SUBCHAPTER E—ALTERNATE FUELS","PART 501—ADMINISTRATIVE PROCEDURES AND SANCTIONS","Subpart F—Exemptions and Certifications"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-10.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:09Z","sha256":"a9b8a73e1c41b200c439cfb8d67be40d8d0582fa3b7dde49bf2264f1ff993722","source_id":"us-cfr","stale":true,"prev":"us/10-cfr-501.53-501.56","next":"us/10-cfr-501.61"},"notice":"GroundRules: Original legal text. Not legal advice."}
