{"data":{"id":"us/10-cfr-53.1270","jurisdiction":"us","citation":"10 CFR 53.1270","heading":"Manufacturing licenses.","body":"Sections 53.1270 through 53.1295 set out the requirements and procedures applicable to Commission issuance of a license under this part authorizing manufacture of manufactured reactors to be installed at sites not identified in the ML application.","path":["Title 10—Energy","CHAPTER I—NUCLEAR REGULATORY COMMISSION","PART 53—RISK-INFORMED, TECHNOLOGY-INCLUSIVE REGULATORY FRAMEWORK FOR COMMERCIAL NUCLEAR PLANTS","Subpart H—Licenses, Certifications, and Approvals"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-10.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:09Z","sha256":"6ca5130e777782234b0618d5db9954e8cb6b267030931733d99d9be5cb5e2318","source_id":"us-cfr","stale":true,"prev":"us/10-cfr-53.1263","next":"us/10-cfr-53.1276"},"notice":"GroundRules: Original legal text. Not legal advice."}
