{"data":{"id":"us/10-cfr-53.1360","jurisdiction":"us","citation":"10 CFR 53.1360","heading":"Operating licenses.","body":"Sections 53.1360 through 53.1405 set out the requirements and procedures applicable to Commission issuance of an OL for a nuclear power facility.","path":["Title 10—Energy","CHAPTER I—NUCLEAR REGULATORY COMMISSION","PART 53—RISK-INFORMED, TECHNOLOGY-INCLUSIVE REGULATORY FRAMEWORK FOR COMMERCIAL NUCLEAR PLANTS","Subpart H—Licenses, Certifications, and Approvals"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-10.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:09Z","sha256":"b8676a0b0fda4b96f189e2ae6a7b61295ab7d6a3e8f843602828cada324c82c0","source_id":"us-cfr","stale":true,"prev":"us/10-cfr-53.1348","next":"us/10-cfr-53.1366"},"notice":"GroundRules: Original legal text. Not legal advice."}
