{"data":{"id":"us/10-cfr-53.520","jurisdiction":"us","citation":"10 CFR 53.520","heading":"Site characteristics.","body":"Site characteristics that might contribute to the initiation, progression, or consequences of LBEs analyzed under § 53.450 must be identified, assessed, and considered in the design and analyses required by subpart C of this part.","path":["Title 10—Energy","CHAPTER I—NUCLEAR REGULATORY COMMISSION","PART 53—RISK-INFORMED, TECHNOLOGY-INCLUSIVE REGULATORY FRAMEWORK FOR COMMERCIAL NUCLEAR PLANTS","Subpart D—Siting Requirements"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-10.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:09Z","sha256":"2a645b736a927e51b33420e345a9fcb4b1c96156cca429e8e6c94c75a64aed8b","source_id":"us-cfr","stale":true,"prev":"us/10-cfr-53.510","next":"us/10-cfr-53.530"},"notice":"GroundRules: Original legal text. Not legal advice."}
