{"data":{"id":"us/10-cfr-53.855","jurisdiction":"us","citation":"10 CFR 53.855","heading":"Emergency preparedness.","body":"(a) Each holder of an OL or COL under this part must have an emergency response plan that must contain information needed to demonstrate compliance with either the requirements in § 50.160 of this chapter or the requirements in appendix E to part 50 and the planning standards of § 50.47(b) of this chapter.\n(b) No initial OL, initial COL, or early site permit that includes complete and integrated emergency plans will be issued under this part unless a finding is made by the NRC, in accordance with § 50.47 of this chapter, that there is reasonable assurance that adequate protective measures can and will be taken in the event of a radiological emergency.","path":["Title 10—Energy","CHAPTER I—NUCLEAR REGULATORY COMMISSION","PART 53—RISK-INFORMED, TECHNOLOGY-INCLUSIVE REGULATORY FRAMEWORK FOR COMMERCIAL NUCLEAR PLANTS","Subpart F—Requirements for Operation"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-10.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:09Z","sha256":"291acb5b03da2e254e6601647f10b2c111c26516c869e777ceb05963cf767bbb","source_id":"us-cfr","stale":true,"prev":"us/10-cfr-53.850","next":"us/10-cfr-53.860"},"notice":"GroundRules: Original legal text. Not legal advice."}
