{"data":{"id":"us/10-cfr-611.205","jurisdiction":"us","citation":"10 CFR 611.205","heading":"Period of award availability.","body":"An award under section 611.204 shall apply to—\n(a) Facilities and equipment placed in service before December 30, 2020; and\n(b) Engineering integration costs incurred during the period beginning on December 19, 2007 and ending on December 30, 2020.","path":["Title 10—Energy","CHAPTER II—DEPARTMENT OF ENERGY","SUBCHAPTER H—ASSISTANCE REGULATIONS","PART 611—ADVANCED TECHNOLOGY VEHICLES MANUFACTURER ASSISTANCE PROGRAM","Subpart C—Facility/Funding Awards"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-10.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:09Z","sha256":"2256f74ae8657fa08b6593074ed7938171abbac5481c21cadab5d95e3fd9bd10","source_id":"us-cfr","stale":true,"prev":"us/10-cfr-611.204","next":"us/10-cfr-611.206"},"notice":"GroundRules: Original legal text. Not legal advice."}
