{"data":{"id":"us/10-cfr-62.18","jurisdiction":"us","citation":"10 CFR 62.18","heading":"Denial of request.","body":"If a request for a determination is based on circumstances that are too remote and speculative to allow an informed determination, the Commission may deny the request.","path":["Title 10—Energy","CHAPTER I—NUCLEAR REGULATORY COMMISSION","PART 62—CRITERIA AND PROCEDURES FOR EMERGENCY ACCESS TO NON-FEDERAL AND REGIONAL LOW-LEVEL WASTE DISPOSAL FACILITIES","Subpart B—Request for a Commission Determination"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-10.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:09Z","sha256":"d0994e2ddbceaf2d60e769c62703bb5dd1098d20cfc2834dbd93fab3077ccc79","source_id":"us-cfr","stale":true,"prev":"us/10-cfr-62.17","next":"us/10-cfr-62.21"},"notice":"GroundRules: Original legal text. Not legal advice."}
