{"data":{"id":"us/10-cfr-63.203","jurisdiction":"us","citation":"10 CFR 63.203","heading":"Implementation of subpart K.","body":"DOE must demonstrate that normal operations at the Yucca Mountain site will and do occur in compliance with this subpart before the Commission grants or continues a license for DOE to receive and possess radioactive material within the Yucca Mountain site.","path":["Title 10—Energy","CHAPTER I—NUCLEAR REGULATORY COMMISSION","PART 63—DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA","Subpart K—Preclosure Public Health and Environmental Standards"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-10.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:09Z","sha256":"0be6b716ac4a027b2c6234c1e70f2e3cc1e46186836ed2e24fccf19f2e22de5b","source_id":"us-cfr","stale":true,"prev":"us/10-cfr-63.202","next":"us/10-cfr-63.204"},"notice":"GroundRules: Original legal text. Not legal advice."}
