{"data":{"id":"us/10-cfr-70.74","jurisdiction":"us","citation":"10 CFR 70.74","heading":"Additional reporting requirements.","body":"(a) Reports to NRC Operations Center. (1) Each licensee shall report to the NRC Operations Center the events described in appendix A to part 70.\n(2) Reports must be made by a knowledgeable licensee representative and by any method that will ensure compliance with the required time period for reporting.\n(3) The information provided must include a description of the event and other related information as described in § 70.50(c)(1).\n(4) Follow-up information to the reports must be provided until all information required to be reported in § 70.50(c)(1) of this subpart is complete.\n(5) Each licensee shall provide reasonable assurance that reliable communication with the NRC Operations Center is available during each event.\n(b) Written reports. Each licensee that makes a report required by paragraph (a)(1) of this section shall submit a written follow-up report within 60 days of the initial report. The written report must be sent to the NRC's Document Control Desk, using an appropriate method listed in § 70.5(a), with a copy to the appropriate NRC regional office listed in appendix D to part 20 of this chapter. The reports must include the information as described in § 70.50(c)(2)(i) through (iv).","path":["Title 10—Energy","CHAPTER I—NUCLEAR REGULATORY COMMISSION","PART 70—DOMESTIC LICENSING OF SPECIAL NUCLEAR MATERIAL","Subpart H—Additional Requirements for Certain Licensees Authorized To Possess a Critical Mass of Special Nuclear Material"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-10.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:09Z","sha256":"1f9fc4ab0b05461dda5e44967a9ce911132eb005451b8c56329375e709d0abad","source_id":"us-cfr","stale":true,"prev":"us/10-cfr-70.73","next":"us/10-cfr-70.76"},"notice":"GroundRules: Original legal text. Not legal advice."}
