{"data":{"id":"us/10-cfr-708.8","jurisdiction":"us","citation":"10 CFR 708.8","heading":"Application to pending cases.","body":"The procedures in this part apply in any complaint proceeding filed with the Head of Field Element or EC Director, as appropriate, on or after the effective date of this part.","path":["Title 10—Energy","CHAPTER III—DEPARTMENT OF ENERGY","PART 708—DOE CONTRACTOR EMPLOYEE PROTECTION PROGRAM","Subpart A—General Provisions"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-10.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:09Z","sha256":"68c38ba8148a64b4cf0d7378ab1c082456ec7fe120ba3358e2c03581d15fe551","source_id":"us-cfr","stale":true,"prev":"us/10-cfr-708.7","next":"us/10-cfr-708.9"},"notice":"GroundRules: Original legal text. Not legal advice."}
