{"data":{"id":"us/10-cfr-76.123","jurisdiction":"us","citation":"10 CFR 76.123","heading":"Tests.","body":"The Corporation shall perform, or permit the Commission to perform, any tests the Commission deems appropriate or necessary for administration of the requirements in this part. These tests include tests of:\n(a) Radioactive material;\n(b) Facilities where radioactive material is utilized, produced or stored;\n(c) Radiation detection and monitoring instruments; and\n(d) Other equipment and devices used in connection with the production, utilization, or storage of radioactive material.","path":["Title 10—Energy","CHAPTER I—NUCLEAR REGULATORY COMMISSION","PART 76—CERTIFICATION OF GASEOUS DIFFUSION PLANTS","Subpart F—Reports and Inspections"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-10.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:09Z","sha256":"b7f1a6d780edf5912fb963ff78853ec4c5e345e199eba6d089bd105232ab81bd","source_id":"us-cfr","stale":true,"prev":"us/10-cfr-76.121","next":"us/10-cfr-76.131"},"notice":"GroundRules: Original legal text. Not legal advice."}
