{"data":{"id":"us/10-cfr-830.7","jurisdiction":"us","citation":"10 CFR 830.7","heading":"Graded approach.","body":"Where appropriate, a contractor must use a graded approach to implement the requirements of this part, document the basis of the graded approach used, and submit that documentation to DOE. The graded approach may not be used in implementing the unreviewed safety question (USQ) process or in implementing technical safety requirements.","path":["Title 10—Energy","CHAPTER III—DEPARTMENT OF ENERGY","PART 830—NUCLEAR SAFETY MANAGEMENT"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-10.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:09Z","sha256":"74fb1a7859615479ae2afb92e78086ac155a34d81cde2571987500aa19481802","source_id":"us-cfr","stale":true,"prev":"us/10-cfr-830.6","next":"us/10-cfr-830.120"},"notice":"GroundRules: Original legal text. Not legal advice."}
