{"data":{"id":"us/10-cfr-851.30","jurisdiction":"us","citation":"10 CFR 851.30","heading":"Consideration of variances.","body":"(a) Variances shall be granted by the Under Secretary after considering the recommendation of the EHSS Director. The authority to grant a variance cannot be delegated.\n(b) The application must satisfy the requirements for applications specified in § 851.31.","path":["Title 10—Energy","CHAPTER III—DEPARTMENT OF ENERGY","PART 851—WORKER SAFETY AND HEALTH PROGRAM","Subpart D—Variances"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-10.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:09Z","sha256":"06c0d23c29134ea57df441b0ba0b183178332241677dfed110cf5c900009f092","source_id":"us-cfr","stale":true,"prev":"us/10-cfr-851.27","next":"us/10-cfr-851.31"},"notice":"GroundRules: Original legal text. Not legal advice."}
