{"data":{"id":"us/10-cfr-904.6","jurisdiction":"us","citation":"10 CFR 904.6","heading":"Charge for capacity and firm energy.","body":"The charge for Capacity and Firm Energy from the Project shall be composed of two separate charges; a charge to provide for the basic revenue requirements, as identified in paragraphs (b), (c), and (d) of § 904.5 of these General Regulations (Base Charge), and a charge to provide the surplus revenue for the Lower Colorado River Basin Development Fund contribution, as identified in paragraph (e) of § 904.5 of these General Regulations (Lower Basin Development Fund Contribution Charge).","path":["Title 10—Energy","CHAPTER III—DEPARTMENT OF ENERGY","PART 904—GENERAL REGULATIONS FOR THE CHARGES FOR THE SALE OF POWER FROM THE BOULDER CANYON PROJECT","Subpart A—Power Marketing"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-10.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:09Z","sha256":"b7088a13745107dc40c0384a8dccd98dae12ff7201d55dd8aef8f82b31e0e9cb","source_id":"us-cfr","stale":true,"prev":"us/10-cfr-904.5","next":"us/10-cfr-904.7"},"notice":"GroundRules: Original legal text. Not legal advice."}
