{"data":{"id":"us/10-cfr-960.3","jurisdiction":"us","citation":"10 CFR 960.3","heading":"Implementation guidelines.","body":"The guidelines of this subpart establish the procedure and basis for applying the postclosure and the preclosure guidelines of subparts C and D, respectively, to evaluations of the suitability of sites. As may be appropriate during the siting process, this procedure requires consideration of a variety of geohydrologic settings and rock types, regionality, and environmental impacts and consultation with affected States, affected Indian tribes, and Federal agencies.","path":["Title 10—Energy","CHAPTER III—DEPARTMENT OF ENERGY","PART 960—GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY","Subpart B—Implementation Guidelines"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-10.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:09Z","sha256":"7c33d85caf0b20d1613b6a5c7fa6319cabc0d4e10281282645ab6e4f7dddc80f","source_id":"us-cfr","stale":true,"prev":"us/10-cfr-960.2","next":"us/10-cfr-960.3-1"},"notice":"GroundRules: Original legal text. Not legal advice."}
