{"data":{"id":"us/10-cfr-963.10","jurisdiction":"us","citation":"10 CFR 963.10","heading":"Scope.","body":"(a) The scope of this subpart includes the following for both the preclosure and postclosure periods:\n(1) The bases for the suitability determination for the Yucca Mountain site as a location for a geologic repository;\n(2) The suitability evaluation methods for applying the site suitability criteria to a geologic repository at the Yucca Mountain site; and\n(3) The site suitability criteria that DOE will apply in accordance with section 113(b)(1)(A)(iv) of the NWPA.\n(b) DOE will seek NRC concurrence on any future revisions to this subpart.","path":["Title 10—Energy","CHAPTER III—DEPARTMENT OF ENERGY","PART 963—YUCCA MOUNTAIN SITE SUITABILITY GUIDELINES","Subpart B—Site Suitability Determination, Methods, and Criteria"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-10.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:09Z","sha256":"8ec5919899aeca5bbe81c084934383c6e9ceca046f78e95e3a5b6e00599a9c63","source_id":"us-cfr","stale":true,"prev":"us/10-cfr-963.2","next":"us/10-cfr-963.11"},"notice":"GroundRules: Original legal text. Not legal advice."}
