{"data":{"id":"us/10-cfr-appendix-a-to-part-25","jurisdiction":"us","citation":"10 CFR Appendix A to Part 25","heading":"Appendix A to Part 25—Fees for NRC Access Authorization","body":"The NRC application fee for an access authorization of type . . . Is the sum of the current DCSA investigation billing rate charged for an investigation of type . . . Plus the NRC's processing fee (rounded to the nearest dollar), which is equal to the investigation billing rate for the type of investigation referenced multiplied by . . . (%)\nInitial “L” access authorization 1 Tier 3 (T3) (Standard Service) 90.2\nReinstatement of “L” access authorization 2 No fee assessed for most applications\nRenewal of “L” access authorization 1 Tier 3 Reinvestigation (T3R) (Standard Service) 90.2\nInitial “Q” access authorization Tier 5 (T5) (Standard Service) 90.2\nInitial “Q” access authorization T5 (Priority Handling) 90.2\nReinstatement of “Q” access authorization 2 No fee assessed for most applications\nRenewal of “Q” access authorization 1 Tier 5 Reinvestigation (T5R) (Standard Service) 90.2\nRenewal of “Q” access authorization 1 Tier 5 Reinvestigation (T5R) (Priority Handling) 90.2\n1 If the NRC determines, based on its review of available data, that a Tier 5 investigation is necessary, the appropriate fee for an Initial “Q” access authorization will be assessed before the conduct of investigation.\n2 Full fee will only be charged if an investigation is required.","path":["Title 10—Energy","CHAPTER I—NUCLEAR REGULATORY COMMISSION","PART 25—ACCESS AUTHORIZATION"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-10.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:09Z","sha256":"c27aa6c14ff38aab1de4d243be665b0ec05e31e0b976f03705faeda2f1a6be9a","source_id":"us-cfr","stale":true,"prev":"us/10-cfr-25.39","next":"us/10-cfr-26.1"},"notice":"GroundRules: Original legal text. Not legal advice."}
