{"data":{"id":"us/10-u.s.c.-3323","jurisdiction":"us","citation":"10 U.S.C. § 3323","heading":"Cost-plus contracting prohibited for military construction and military family housing projects","body":"(a) Prohibition.—A contract entered into by the United States in connection with a military construction project or a military family housing project may not use any form of cost-plus contracting. (b) Applicability.—The prohibition specified in subsection (a)—(1) is in addition to the prohibition specified in section 3322(a) of this title on the use of the cost-plus-a-percentage-of-cost system of contracting; and (2) applies notwithstanding a declaration of war or the declaration by the President of a national emergency under section 201 of the National Emergencies Act (50 U.S.C. 1621) that includes the use of the armed forces.","path":["Title 10—ARMED FORCES","CHAPTER 242—SPECIFIC TYPES OF CONTRACTS"],"source_url":"https://uscode.house.gov/download/releasepoints/us/pl/119/103/xml_usc10@119-103.zip","current_through":"Public Law 119-103 (09/02/2026)","vintage":"","retrieved_at":"2026-09-10T05:56:10Z","sha256":"6998bdcacf82e7f4f782d1bb2eb7301c8389aa942f88c495dffe605f74690c92","source_id":"us","stale":false,"prev":"us/10-u.s.c.-3322","next":"us/10-u.s.c.-3324"},"notice":"GroundRules: Original legal text. Not legal advice."}