{"data":{"id":"us/13-cfr-126.504","jurisdiction":"us","citation":"13 CFR 126.504","heading":"When will SBA remove the designation of a concern in DSBS (or successor system) as a certified HUBZone small business concern?","body":"(a) SBA will remove the designation of a concern in DSBS (or successor system) as a certified HUBZone small business concern if the concern has:\n(1) Been decertified as a result of a HUBZone status protest pursuant to § 126.803;\n(2) Been decertified as a result of the procedures set forth in § 126.503;\n(3) Been debarred pursuant to the procedures in FAR 9.4; or\n(4) Voluntarily withdrawn from the HUBZone program.\n(b) SBA will remove the designation of a concern in DSBS (or successor system) as a certified HUBZone small business concern as soon as the D/HUB issues a decision decertifying the concern from the program.","path":["Title 13—Business Credit and Assistance","CHAPTER I—SMALL BUSINESS ADMINISTRATION","PART 126—HUBZONE PROGRAM","Subpart E—Maintaining HUBZone Status"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-13.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:18Z","sha256":"66a7c628617e88e19e058817070ba4aab9fe308e94510122610ec619441b5008","source_id":"us-cfr","stale":true,"prev":"us/13-cfr-126.503","next":"us/13-cfr-126.600"},"notice":"GroundRules: Original legal text. Not legal advice."}
