{"data":{"id":"us/13-cfr-400.215","jurisdiction":"us","citation":"13 CFR 400.215","heading":"Supplemental Guarantees.","body":"The Board will allow the structure of a guaranteed loan to include one or more Supplemental Guarantees that cover the Unguaranteed Portion of the loan; provided that:\n(a) There shall be no Supplemental Guarantee with respect to the Unguaranteed Portion required to be held by the Agent pursuant to § 400.210(c);\n(b) The Loan Documents relating to any Supplemental Guarantee shall be acceptable in form and substance to the Board; and\n(c) In approving the issuance of a Guarantee, the Board may impose any conditions with respect to Supplemental Guarantee(s) relating to the loan that it considers appropriate.","path":["Title 13—Business Credit and Assistance","CHAPTER IV—EMERGENCY STEEL GUARANTEE LOAN BOARD","PART 400—EMERGENCY STEEL GUARANTEE LOAN PROGRAM","Subpart C—Steel Guarantee Loans"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-13.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:18Z","sha256":"db8ccf91e813cb4f6a4adafc53ca88694c7dba0521d69f163a17a539b2cd8351","source_id":"us-cfr","stale":true,"prev":"us/13-cfr-400.214","next":"us/13-cfr-500.1"},"notice":"GroundRules: Original legal text. Not legal advice."}
