{"data":{"id":"us/15-u.s.c.-7307","jurisdiction":"us","citation":"15 U.S.C. § 7307","heading":"National Construction Safety Team report","body":"Not later than 90 days after completing an investigation, a Team shall issue a public report which includes—(1) an analysis of the likely technical cause or causes of the building failure investigated; (2) any technical recommendations for changes to or the establishment of evacuation and emergency response procedures; (3) any recommended specific improvements to building standards, codes, and practices; and (4) recommendations for research and other appropriate actions needed to help prevent future building failures.","path":["Title 15—COMMERCE AND TRADE","CHAPTER 99—NATIONAL CONSTRUCTION SAFETY TEAM"],"source_url":"https://uscode.house.gov/download/releasepoints/us/pl/119/103/xml_usc15@119-103.zip","current_through":"Public Law 119-103 (09/02/2026)","vintage":"","retrieved_at":"2026-09-10T05:56:39Z","sha256":"e920176f97857ba5b7da48c07024924ab7a167c19bd47bf65d1fd1ea2b78d098","source_id":"us","stale":true,"prev":"us/15-u.s.c.-7306","next":"us/15-u.s.c.-7308"},"notice":"GroundRules: Original legal text. Not legal advice."}
