{"data":{"id":"us/18-cfr-12.25","jurisdiction":"us","citation":"18 CFR 12.25","heading":"Posting and readiness.","body":"(a) A copy of the current emergency action plan itself must be posted in a prominent location readily accessible to the licensee's or applicant's operating personnel who are responsible for controlling water flows and for notifying public health and safety agencies and affected persons.\n(b) Each licensee or applicant must annually test the state of training and readiness of key licensee or applicant personnel responsible for responding properly during a project emergency to ensure that they know and understand the procedures to be followed throughout a project emergency.","path":["Title 18—Conservation of Power and Water Resources","CHAPTER I—FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY","SUBCHAPTER B—REGULATIONS UNDER THE FEDERAL POWER ACT","PART 12—SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS","Subpart C—Emergency Action Plans"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-18.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:34Z","sha256":"15b5fceea99212437ff89522664cbf160b76340606f63680c74fb66068ce434f","source_id":"us-cfr","stale":true,"prev":"us/18-cfr-12.24","next":"us/18-cfr-12.30"},"notice":"GroundRules: Original legal text. Not legal advice."}
