{"data":{"id":"us/18-cfr-12.60","jurisdiction":"us","citation":"18 CFR 12.60","heading":"Applicability.","body":"The licensee of any dam or other project work classified as having a high or significant hazard potential, as defined in § 12.3(b)(13)(i) and (ii), is required to submit an Owner's Dam Safety Program to the Regional Engineer.","path":["Title 18—Conservation of Power and Water Resources","CHAPTER I—FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY","SUBCHAPTER B—REGULATIONS UNDER THE FEDERAL POWER ACT","PART 12—SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS","Subpart F—Owner's Dam Safety Program"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-18.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:34Z","sha256":"5952cfd98b4eb7b144015d93f9c59edc87d390b321f83e52ef4921ec13779dc9","source_id":"us-cfr","stale":true,"prev":"us/18-cfr-12.55-12.59","next":"us/18-cfr-12.61"},"notice":"GroundRules: Original legal text. Not legal advice."}
