{"data":{"id":"us/18-cfr-1304.9","jurisdiction":"us","citation":"18 CFR 1304.9","heading":"Initiation of construction.","body":"A permit issued pursuant to this part shall expire unless the applicant initiates construction within eighteen (18) months after the date of issuance.","path":["Title 18—Conservation of Power and Water Resources","CHAPTER XIII—TENNESSEE VALLEY AUTHORITY","PART 1304—APPROVAL OF CONSTRUCTION IN THE TENNESSEE RIVER SYSTEM AND REGULATION OF STRUCTURES AND OTHER ALTERATIONS","Subpart A—Procedures for Approval of Construction"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-18.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:34Z","sha256":"ec26fe08220bb3ef3a3fadbb8d29773a66b874d2c83b7b4856c6d101501f6710","source_id":"us-cfr","stale":true,"prev":"us/18-cfr-1304.8","next":"us/18-cfr-1304.10"},"notice":"GroundRules: Original legal text. Not legal advice."}
