{"data":{"id":"us/18-cfr-153.17","jurisdiction":"us","citation":"18 CFR 153.17","heading":"Effectiveness of Presidential Permit.","body":"A Presidential Permit, once issued by the Commission, shall not be effective until it has been accepted by the highest authority of the Permittee, as indicated by Permittee's execution of a Testimony of Acceptance, and a certified copy of the accepted Presidential Permit and the executed Testimony of Acceptance has been filed with the Commission.","path":["Title 18—Conservation of Power and Water Resources","CHAPTER I—FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY","SUBCHAPTER E—REGULATIONS UNDER NATURAL GAS ACT","PART 153—APPLICATIONS FOR AUTHORIZATION TO CONSTRUCT, OPERATE, OR MODIFY FACILITIES USED FOR THE EXPORT OR IMPORT OF NATURAL GAS","Subpart C—Application for a Presidential Permit"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-18.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:34Z","sha256":"26a4aa63fbe4bcd14688aa788bbab4d22cacce676495873e6424e40b936997c2","source_id":"us-cfr","stale":true,"prev":"us/18-cfr-153.16","next":"us/18-cfr-153.20"},"notice":"GroundRules: Original legal text. Not legal advice."}
