{"data":{"id":"us/18-cfr-154.400","jurisdiction":"us","citation":"18 CFR 154.400","heading":"Additional requirements.","body":"In addition to the requirements of subparts A, B, and C of this part, any proposal to implement a limited rate change must comply with this subpart.","path":["Title 18—Conservation of Power and Water Resources","CHAPTER I—FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY","SUBCHAPTER E—REGULATIONS UNDER NATURAL GAS ACT","PART 154—RATE SCHEDULES AND TARIFFS","Subpart E—Limited Rate Changes"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-18.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:34Z","sha256":"2fab206df24f0f03f24ea017e230dcc5a47ed52a386335b352a366cb01c9073c","source_id":"us-cfr","stale":true,"prev":"us/18-cfr-154.315","next":"us/18-cfr-154.401"},"notice":"GroundRules: Original legal text. Not legal advice."}
