{"data":{"id":"us/18-cfr-4.101","jurisdiction":"us","citation":"18 CFR 4.101","heading":"Applicability.","body":"This subpart provides procedures for exemption on a case-specific basis from all or part of Part I of the Federal Power Act (Act), including licensing, for small hydroelectric power projects as defined in § 4.30(b)(31).","path":["Title 18—Conservation of Power and Water Resources","CHAPTER I—FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY","SUBCHAPTER B—REGULATIONS UNDER THE FEDERAL POWER ACT","PART 4—LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS","Subpart K—Exemption of Small Hydroelectric Power Projects of 10 Megawatts or Less"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-18.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:34Z","sha256":"33868168c242b5f2f99a7315364b5b8f6c595c1ee56578df521cd80acb6f6893","source_id":"us-cfr","stale":true,"prev":"us/18-cfr-4.96","next":"us/18-cfr-4.102"},"notice":"GroundRules: Original legal text. Not legal advice."}
