{"data":{"id":"us/18-cfr-4.70","jurisdiction":"us","citation":"18 CFR 4.70","heading":"Applicability.","body":"This subpart applies to any application for license issued solely for a transmission line that transmits power from a licensed water power project to the point of junction with the distribution system or with the interconnected primary transmission system.","path":["Title 18—Conservation of Power and Water Resources","CHAPTER I—FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY","SUBCHAPTER B—REGULATIONS UNDER THE FEDERAL POWER ACT","PART 4—LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS","Subpart H—Application for License for Transmission Line Only"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-18.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:34Z","sha256":"c1f4addf7e28f81e14cb427111dd2e6e53e79512f74dd1ce79fb5d14082beea9","source_id":"us-cfr","stale":true,"prev":"us/18-cfr-4.61","next":"us/18-cfr-4.71"},"notice":"GroundRules: Original legal text. Not legal advice."}
