{"data":{"id":"us/18-cfr-401.1","jurisdiction":"us","citation":"18 CFR 401.1","heading":"Scope.","body":"This subpart shall govern the submission, consideration, and inclusion of projects into the Comprehensive Plan.","path":["Title 18—Conservation of Power and Water Resources","CHAPTER III—DELAWARE RIVER BASIN COMMISSION","SUBCHAPTER A—ADMINISTRATIVE MANUAL","PART 401—RULES OF PRACTICE AND PROCEDURE","Subpart A—Comprehensive Plan"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-18.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:34Z","sha256":"1707c7c08098985e6cad5afb690c61b63871113c2364c67ef093321bc28048b0","source_id":"us-cfr","stale":true,"prev":"us/18-cfr-401.0","next":"us/18-cfr-401.2"},"notice":"GroundRules: Original legal text. Not legal advice."}
