{"data":{"id":"us/18-cfr-50.10","jurisdiction":"us","citation":"18 CFR 50.10","heading":"Interventions.","body":"Notices of applications, as provided by § 50.9, will fix the time within which any person desiring to participate in the proceeding may file a petition to intervene, and within which any interested regulatory agency, as provided by § 385.214 of this chapter, desiring to intervene may file its notice of intervention.","path":["Title 18—Conservation of Power and Water Resources","CHAPTER I—FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY","SUBCHAPTER B—REGULATIONS UNDER THE FEDERAL POWER ACT","PART 50—APPLICATIONS FOR PERMITS TO SITE INTERSTATE ELECTRIC TRANSMISSION FACILITIES"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-18.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:34Z","sha256":"f3562ce39f0c28bbf8ffa2fe06dc8cc9191818efa48caf56597f36c53b487b32","source_id":"us-cfr","stale":true,"prev":"us/18-cfr-50.9","next":"us/18-cfr-50.11"},"notice":"GroundRules: Original legal text. Not legal advice."}
