{"data":{"id":"us/18-cfr-7.9","jurisdiction":"us","citation":"18 CFR 7.9","heading":"Transition provision.","body":"This part shall only apply to original license applications filed on or after July 23, 2019.","path":["Title 18—Conservation of Power and Water Resources","CHAPTER I—FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY","SUBCHAPTER B—REGULATIONS UNDER THE FEDERAL POWER ACT","PART 7—EXPEDITED LICENSING PROCESS FOR QUALIFYING NON-FEDERAL HYDROPOWER PROJECTS AT EXISTING NONPOWERED DAMS AND FOR CLOSED-LOOP PUMPED STORAGE PROJECTS"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-18.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:34Z","sha256":"dcdf948ea627303cbab8537b9e5800f67c085b54b1f52b1692390e56b2cbec67","source_id":"us-cfr","stale":true,"prev":"us/18-cfr-7.8","next":"us/18-cfr-8.1"},"notice":"GroundRules: Original legal text. Not legal advice."}
