{"data":{"id":"us/19-cfr-115.38","jurisdiction":"us","citation":"19 CFR 115.38","heading":"Application.","body":"A written request for approval of a container after manufacture may be made by the owner or operator to a Certifying Authority and must include the following:\n(a) Three copies, each no longer than 3 feet by 4 feet, of the Customs and TIR/Container plan;\n(b) Customs and TIR/Container plan number;\n(c) Three copies of the specifications which include the following information:\n(1) Type of container;\n(2) Name and business address of applicant;\n(3) Identification marks and numbers;\n(4) Tare weight;\n(5) Nominal overall dimensions in centimeters;\n(6) Type of construction and essential particulars of structure (nature of materials, coating system used, parts which are reinforced, whether bolts are riveted or welded, and similar matters); and\n(7) Proposed location and date for inspection of the container.","path":["Title 19—Customs Duties","CHAPTER I—U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY","PART 115—CARGO CONTAINER AND ROAD VEHICLE CERTIFICATION PURSUANT TO INTERNATIONAL CUSTOMS CONVENTIONS","Subpart D—Procedures for Approval of Containers After Manufacture"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-19.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:40Z","sha256":"7849aa9be5a66b72d0d18057d3dea297bdb3cb987b37c3fa8c09a9ffacf3df98","source_id":"us-cfr","stale":true,"prev":"us/19-cfr-115.37","next":"us/19-cfr-115.39"},"notice":"GroundRules: Original legal text. Not legal advice."}
