{"data":{"id":"us/23-cfr-630.705","jurisdiction":"us","citation":"23 CFR 630.705","heading":"Procedures.","body":"(a) An advance construction project shall meet the same requirements and be processed in the same manner as a regular Federal-aid project, except,\n(1) The FHWA authorization does not constitute any commitment of Federal funds on the project, and\n(2) The FHWA shall not reimburse the State until the project is converted under § 630.709.\n(b) [Reserved]","path":["Title 23—Highways","CHAPTER I—FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION","SUBCHAPTER G—ENGINEERING AND TRAFFIC OPERATIONS","PART 630—PRECONSTRUCTION PROCEDURES","Subpart G—Advance Construction of Federal-Aid Projects"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-23.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:50Z","sha256":"f85bfec8f1f615c3136ff632fabee0d7bfbda7f121ac2eb03556c1d9a3321632","source_id":"us-cfr","stale":true,"prev":"us/23-cfr-630.703","next":"us/23-cfr-630.707"},"notice":"GroundRules: Original legal text. Not legal advice."}