{"data":{"id":"us/23-cfr-635.101","jurisdiction":"us","citation":"23 CFR 635.101","heading":"Purpose.","body":"To prescribe policies, requirements, and procedures relating to Federal-aid highway projects, from the time of authorization to proceed to the construction stage, to the time of final acceptance by the Federal Highway Administration (FHWA).","path":["Title 23—Highways","CHAPTER I—FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION","SUBCHAPTER G—ENGINEERING AND TRAFFIC OPERATIONS","PART 635—CONSTRUCTION AND MAINTENANCE","Subpart A—Contract Procedures"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-23.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:50Z","sha256":"826fef5161b54cfd7997c85ed6ff0a472bde0b8d733121b393d990c3e05ed42c","source_id":"us-cfr","stale":true,"prev":"us/23-cfr-630.1112","next":"us/23-cfr-635.102"},"notice":"GroundRules: Original legal text. Not legal advice."}
