{"data":{"id":"us/23-cfr-635.305","jurisdiction":"us","citation":"23 CFR 635.305","heading":"Physical construction.","body":"For purposes of this subpart the physical construction of a project is considered to consist of the actual construction of the highway itself with its appurtenant facilities. It includes any removal, adjustment or demolition of buildings or major obstructions, and utility or railroad work that is a part of the contract for the physical construction.","path":["Title 23—Highways","CHAPTER I—FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION","SUBCHAPTER G—ENGINEERING AND TRAFFIC OPERATIONS","PART 635—CONSTRUCTION AND MAINTENANCE","Subpart C—Physical Construction Authorization"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-23.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:50Z","sha256":"22d60735023834cd1ff3a5b151451f4a3a68b97b0e5deec05170c2c1bb5a27a4","source_id":"us-cfr","stale":true,"prev":"us/23-cfr-635.303","next":"us/23-cfr-635.307"},"notice":"GroundRules: Original legal text. Not legal advice."}
