{"data":{"id":"us/23-cfr-635.307","jurisdiction":"us","citation":"23 CFR 635.307","heading":"Coordination.","body":"(a) The right-of-way clearance, utility, and railroad work are to be so coordinated with the physical construction that no unnecessary delay or cost for the physical construction will occur.\n(b) All right-of-way clearance, utility, and railroad work performed separately from the contract for the physical construction of the project are to be accomplished in accordance with provisions of the following:\n(1) 23 CFR part 140, subpart I;\n(2) 23 CFR part 646, subpart B;\n(3) 23 CFR 710.403; and\n(4) 23 CFR part 645, subpart A.","path":["Title 23—Highways","CHAPTER I—FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION","SUBCHAPTER G—ENGINEERING AND TRAFFIC OPERATIONS","PART 635—CONSTRUCTION AND MAINTENANCE","Subpart C—Physical Construction Authorization"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-23.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:50Z","sha256":"6c6da7d3d3ad086863e8f264091eec07aec05ee018f5b0e4979f05c4d71ad46e","source_id":"us-cfr","stale":true,"prev":"us/23-cfr-635.305","next":"us/23-cfr-635.309"},"notice":"GroundRules: Original legal text. Not legal advice."}
