{"data":{"id":"us/23-cfr-635.405","jurisdiction":"us","citation":"23 CFR 635.405","heading":"Applicability.","body":"The requirements and procedures prescribed in this subpart apply to all contracts relating to Federal-aid highway projects.","path":["Title 23—Highways","CHAPTER I—FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION","SUBCHAPTER G—ENGINEERING AND TRAFFIC OPERATIONS","PART 635—CONSTRUCTION AND MAINTENANCE","Subpart D—General Material Requirements"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-23.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:50Z","sha256":"95e271ffa60c4728b54ba4c0e06eb6390812e26e9166c11de6a35c7a211e535c","source_id":"us-cfr","stale":true,"prev":"us/23-cfr-635.403","next":"us/23-cfr-635.407"},"notice":"GroundRules: Original legal text. Not legal advice."}
