{"data":{"id":"us/23-cfr-635.503","jurisdiction":"us","citation":"23 CFR 635.503","heading":"Applicability.","body":"The provisions of this subpart apply to all Federal-aid projects within the right-of-way of a public highway, those projects required by law to be treated as if located on a Federal-aid highway, and other projects which are linked to such projects (i.e., the project would not exist without another Federal-aid highway project) that are to be delivered using the CM/GC contractor method.","path":["Title 23—Highways","CHAPTER I—FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION","SUBCHAPTER G—ENGINEERING AND TRAFFIC OPERATIONS","PART 635—CONSTRUCTION AND MAINTENANCE","Subpart E—Construction Manager/General Contractor (CM/GC) Contracting"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-23.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:50Z","sha256":"123a03699b2395b0b23a54109d208132523bd023317c7b8e7d34a134990369de","source_id":"us-cfr","stale":true,"prev":"us/23-cfr-635.502","next":"us/23-cfr-635.504"},"notice":"GroundRules: Original legal text. Not legal advice."}
